What
image
  • Access Control Systems
  • Communication and Networking
  • Consulting and Advisory Services
  • Customer Service and Support
  • Data and Analytics
  • Design & Construction
  • Environmental and Sustainability
  • Equipment and Supplies
  • Insurance and Financial Services
  • Legal and Regulatory Compliance
  • Marketing and Advertising
  • Parking Management
  • Payment Solutions
  • Renewable Energy Solutions
  • Security Services
  • Signage and Information Systems
  • Specialized Services
  • Technological Solutions
  • Training and Development
Where
image
image

🚗 Park Wood Car Park – The Complete Milton Keynes EV Charging Hub

BP Pulse rapid chargers at Park Wood Car Park – free parking 24/7 with easy M1 access; perfect for EV drivers and shoppers at Kingston Centre.

Be the first to review

🚗 Type: Free Public Surface Car Park with BP Pulse EV Charging
🕒 Open: 24 hours / day, 7 days / week
🌟 Rating: 4.2 / 5 (Zap-Map user reviews)


💰 Pricing & Permits

  • Parking Cost: Free (no time limits)

  • EV Charging Cost:

    • 50 kW charger: £0.35 per kWh

    • 150 kW rapid charger: £0.45 per kWh

  • Payment: Via BP Pulse app or RFID card at the charging kiosk

  • Future Changes: Council evaluating installation of two additional 150 kW bays in late 2025


📊 Capacity & Physical Features

FeatureDetail
Total Spaces120 marked bays
SurfaceTarmac with designated EV bays
LightingLED column lighting throughout
SecurityCCTV coverage; occasional patrols
Height LimitNone (suitable for vans & larger vehicles)

Accessibility

  • Disabled Access: 4 marked Blue Badge bays adjacent to main entrance

  • Drop-Off Zone: Lay-by on Chaffron Way immediately outside car park gate


🔌 EV Infrastructure

  • On-Site Charging:

    • 2 × BP Pulse 50 kW DC chargers

    • 2 × BP Pulse 150 kW rapid DC chargers

  • Charger Locations: Bays 1–4 along eastern edge, clearly signposted

  • Nearest Additional Options:

    • Kingston Centre (Pod Point): 4×7 kW AC chargers – 0.2 mi (4-min walk)

    • McConnell Drive (Shell Recharge): 2×150 kW – 0.5 mi (10-min walk)


📅 Peak Times & Occupancy

TimeframeOccupancyUser Profile
Weekdays 7–9 AM~75 %Commuter charging
Weekdays 12–2 PM~50 %Shopping & school runs
Weekdays 4–6 PM~80 %Rapid top-ups before home
Weekends 10 AM–2 PM~60 %Leisure drivers & families

Pro Tip: Arrive outside weekday peak (9–11 AM or after 2 PM) for fastest charger availability.


🚶 Walkability Score

DestinationWalk TimeKey Benefit
Kingston Centre Retail Park4 minSupermarkets, high-street shops & cafés
Milton Keynes College (Chaffron)6 minCampus facilities & café
Bassett’s Mead Local Park8 minGreen space and picnic areas
Xscape & Snow Dome Arena10 minLeisure & entertainment complex

🛒 Nearby Amenities
Essentials

  • Public Toilets: Kingston Centre – 4 min walk

  • ATM: NatWest (Kingston Centre East) – 5 min walk

  • Pharmacy: Boots (Kingston Centre) – 4 min walk

Food & Drink

  • Costa Coffee (Kingston Centre): Coffee & snacks – 4 min

  • The Exchange (Retail Park): Food court with multiple cuisines – 5 min

  • The Lime Tree (Bassett’s Mead): Pub food & local ales – 8 min


🅿️ Alternative Parking Comparison

SiteDistanceCostMax StayAdvantage
Kingston Centre Car Park0.2 miFreeUnlimitedCovered EV chargers (Pod Point)
Xscape Multi-Storey0.6 mi£2.50/hr (max £10)24 hIndoor, CCTV & staffed
Church Green Pay & Display0.8 mi£1/hr (max £5)12 hCheaper for short town-centre stays

⚠️ Important Notices

  • Charger Access: EV bays enforced—non-EVs will be ticketed.

  • App Reliability: Keep BP Pulse app updated for seamless authentication.

  • Weather Impact: Eastern bays can flood in heavy rain—use western chargers first.


📌 Expert Tips

  • Charge & Shop: Plug in, then stroll through Kingston Centre while your EV tops up.

  • Rapid Boost Hack: Use a 150 kW bay for a 20 %–80 % charge in ~20 minutes.

  • Evade Queues: Monitor live charger availability via the BP Pulse app before departure.

  • Evening Saver: After 8 PM, free parking remains, but chargers stay pay-as-you-go.


🔮 Future Developments

  • Late 2025: Installation of two additional 150 kW rapid chargers pending council approval.

  • 2026: Solar canopy project planned to offset station power draw and provide covered parking.

image