What
image
  • Access Control Systems
  • Communication and Networking
  • Consulting and Advisory Services
  • Customer Service and Support
  • Data and Analytics
  • Design & Construction
  • Environmental and Sustainability
  • Equipment and Supplies
  • Financial, Debt & Insolvency
  • Legal and Regulatory Compliance
  • Marketing and Advertising
  • Parking Management
  • Payment Solutions
  • Renewable Energy Solutions
  • Security Services
  • Signage and Information Systems
  • Specialized Services
  • Technological Solutions
  • Training and Development
Where
image
image

🚗 Car Park 5 (Frenchay Campus) – The Complete Stoke Gifford BS16 Parking Guide

Convenient visitor parking at UWE Frenchay – Pay & Display bays, EV charging, Blue Badge access & 24/7 campus entry.

Be the first to review

Do you own a driveway, land, or car park?

Generate extra revenue by advertising your space for FREE. Join our network and start connecting with drivers today.

Now over 2,000,000 platform views
Generate Extra Revenue

🚗 Type: Surface Pay & Display / Permit Car Park (Managed by University of the West of England)
🕒 Open: 24 hours/day, 7 days/week (no barrier control)
🌟 Rating: 4.0/5 (Campus users’ feedback)


💰 Pricing & Permits

Category Rate Notes
Visitor Pay & Display £1.50 per hour Max stay 6 h; pay at machines or via RingGo
Daily Visitor Cap £7.00 per 24 h period Auto-applies once 5 h paid
Staff/Student Permits £300/year (staff) Season permits via MyParking portal
  £200/year (students)  
Blue Badge Holders Free up to 3 h Badge + time clock display required; validate at reception for extension

📊 Capacity & Physical Features

Feature Detail
Total Spaces ~450 marked bays
Disabled Bays 12 spread near main teaching buildings
Surface Tarmac
Lighting Full LED coverage
Security CCTV in corridors; campus security patrols
Height Limit None

Accessibility

  • Blue Badge Bays: 12 bays; clearly signed

  • Drop-off Zone: 10 min lay-by outside Student Union entrance

  • Step-Free Routes: Level kerb cuts to all main campus buildings


🔌 EV Infrastructure

  • On-Site Chargers: 6 bays with 7 kW chargers (pay per kWh via Pod Point app)

  • Nearest Additional:

    • Bristol Parkway Station (Pod Point, 4×7 kW): 10 min walk

    • Coachway Park & Ride (Shell Recharge, 2×50 kW): 5 min drive


📅 Peak Times & Occupancy

Timeframe Occupancy User Profile
Weekdays 08:00–10:00 90 % Staff & students arriving
Weekdays 12:00–14:00 70 % Lecture changeovers & visitors
Weekdays 16:00–18:00 80 % Late classes & seminars
Evenings & Weekends 40 % Conference attendees

Pro Tip: Visitors with afternoon bookings can pay flat daily cap and leave/re-enter campus freely.


🚶 Walkability Score

Destination Walk Time Key Benefit
Student Union & Library 3 min Central campus hub & helpdesk
R Block Lecture Theatres 5 min Major teaching facilities
Campus Sports Centre 7 min Gym, pool & courts
Gloucester Road Shops & Café 10 min Convenience store & café options

🛒 Nearby Amenities

  • ATM: Santander in Student Union

  • Pharmacy: Campus Health Centre (order prescriptions in advance)

  • Food & Drink:

    • Starbucks & Costa in main concourse

    • Vending kiosks across campus

  • Public Toilets: In every teaching block and Student Union


🅿️ Alternative Parking Comparison

Site Distance Cost Max Stay Advantage
Coachway Park & Ride 0.8 mi £2.60/day 24 h Fast EV charging & shuttle to campus
Bristol Parkway Station CP 1 mi £8 / day 24 h Rail connections & covered bays
Filton Avenue On-Street Bays 0.5 mi £1.20/h (2 h max) 2 h Cheap short-stay

⚠️ Important Notices

  • Enforcement: Strict patrols 07:00–19:00; overstay or no-pay incurs £80 PCN

  • Return Restriction: No re-entry within 30 min of exit

  • Event Days: Large conferences can fill Car Park 5—book instead via MyParking portal


📌 Expert Tips

  • Pre-Book Permits: Staff and regular visitors save by securing a season permit

  • EV Drivers: Top up via Pod Point app before arriving to confirm charger availability

  • Conference Delegates: Use flat-cap daily rate and QR-code re-entry to avoid queue at machines


🔮 Future Developments

  • 2025: Proposal to add 4 rapid (50 kW) chargers and upgrade lighting to motion-sensor LEDs

  • 2026: Implementation of ANPR for seamless pay-on-exit workflow

image