What
image
  • Access Control Systems
  • Communication and Networking
  • Consulting and Advisory Services
  • Customer Service and Support
  • Data and Analytics
  • Design & Construction
  • Environmental and Sustainability
  • Equipment and Supplies
  • Financial, Debt & Insolvency
  • Legal and Regulatory Compliance
  • Marketing and Advertising
  • Parking Management
  • Payment Solutions
  • Renewable Energy Solutions
  • Security Services
  • Signage and Information Systems
  • Specialized Services
  • Technological Solutions
  • Training and Development
Where
image
image

🚗 Porth Farm Car Park – The Complete Perranporth & Coast Path Parking Guide

Porth Farm – National Trust parking, pay & display, free evenings & Sundays, gateway to South West Coast Path.

Be the first to review

🚗 Type: Public Pay & Display Car Park (National Trust)
🕒 Open: Enforcement 08:00–18:00 daily; free evenings (18:00–08:00), all day Sunday & Bank Holidays
🌟 Rating: N/A (National Trust facility)


💰 Pricing & Permits

  • Tariffs (08:00–18:00):

    • Up to 1 h: £1.00

    • Up to 2 h: £2.00

    • Up to 4 h (max stay): £4.00

  • Payment Methods:

    • Pay & Display machines (coins, contactless card)

    • National Trust Parking app (pre-pay via member account)

  • National Trust Members: Free parking (display membership card)

  • Blue Badge Holders: Free when badge displayed; still register at machine


📊 Capacity & Physical Features

FeatureDetail
Total Spaces~80 bays
Disabled Bays4 marked bays (adjacent to visitor hub)
SurfaceCompact gravel with drainage channels
LightingSolar-powered bollard lights (dusk–dawn)
SecurityCCTV covering entrance & hub; NT ranger patrols
SignageNational Trust directional signs & tariff boards
Machine LocationTwo machines—entrance and near visitor information kiosk

Accessibility & Adapted Facilities

  • Accessible Bays: Four bays by visitor hub—level access to paths

  • Drop-Off Zone: Pull-in beside main kiosk for loading/unloading

  • Pathway Surfacing: Compact crushed stone; gentle gradients onto coast path

  • Seating & Shelter: Picnic benches and solar shelter at hub


🔌 EV Infrastructure & Nearby Options

  • On-Site Charging: None currently installed

  • Nearest Public Chargers:

    • Perranporth Village CP: 2×7 kW Pod Point, 5 min drive

    • Truro Station MSCP: 4×22 kW rapid, 15 min drive


📅 Demand Patterns & Seasonal Variations

PeriodOccupancyUser Profile
Spring (Mar–May) weekends70 %Coast walkers & day-trippers
Summer (Jun–Aug) daily95 %Tourists & surfers
Autumn weekdays50 %Local walkers
Winter off-peak30 %Quiet exploration

Pro Tip: Arrive before 10:00 in summer to secure a bay; evenings after 18:00 are always free.


🚶 Walkability & Trail Access

DestinationWalk TimeKey Benefit
South West Coast Path EntryAdjacentDirect access to cliff-top and beach routes
Porth Farm Visitor Hub1 minInformation, toilets & NT shop
Perranporth Beach5 minSurfing, sand dunes & café
National Trust Coastal WalksFrom hubWaymarked circular & linear routes

🛒 Nearby Amenities & Services
Essentials

  • Public Toilets: Visitor hub (free for members; pay-by-card for non-members)

  • NT Shop & Cafe: At hub – refreshments & maps

  • Picnic Area: Tables overlooking cove

Local Services

  • Perranporth Post Office & Stores: 5 min walk

  • Surf Hire & Lessons: Beachside kiosks


⚠️ Important Notices & Byelaws

  • Enforcement: 08:00–18:00 daily by NT wardens; Pay & Display ticket required

  • Overstay Penalty: £70 PCN (reduced to £35 if paid within 14 days)

  • Vehicle Size: Max height 2.2 m; larger vehicles by prior arrangement

  • Maintenance: Gravel grading & machine servicing monthly


📌 Visitor Tips

  • NT Membership: Free parking and discounts—join online or at hub.

  • Blue Badge Holders: Display badge and register at machine for free stay.

  • Early Bird: Sunrise walkers benefit from free pre-pay option via app.

  • Weather Alert: Exposed to winds—check forecast before coastal walks.


🔮 Future Developments & Planning

  • 2025 Q2: Installation of solar canopy over machines for weather protection

  • 2025 Q3: Feasibility study for 4×7 kW EV chargers (NT sustainability fund)

  • 2026: Proposal to extend by +20 bays on adjacent field (planning ref: NT/PLN/2024/1052)

  • Accessibility Audit: Full review of path gradients & signage in early 2026

image